It has been about a year now since I build the first Timber table.
Since then I have exhibited it in Milan (April 2010) and London (Sep. 2010). There has been much positive feedback but the table is still not in production.
This is a follow up on the Timber project with new pictures of the first pieces from the workshop.
All pictures (except x-rays) are taken by Tobias Selnæs Markussen. Video by Lisbet Koerner.
The original assembly video where I put it together. Notice how it is assembled in-box.
A veterinarian helped with these great x-rays.
Below is my hands and a bag of Ikea screws ;-)
Discuss This Project: ( comments)